Projects
Concrete Repair and Insulation Projects
Mechanical, Electrical and Fire-fighting Projects

Saudi Water Authority
Supply and installation of surveillance system via CCTV operational cameras at several locations in the pipeline, pipeline stations, pumping stations and tanks affiliated with the Al-Shaqiq Abha Dhahran Al-Janoub station

Fourth Land Forces Aviation Group
Repair of firefighting and alarm systems and maintenance of the electric winch in the aircraft maintenance hangar of the Fourth Land Forces Aviation Group

Water Transmission & Technology
Periodic maintenance and technical support works for the fire alarm system in Ras Al-Khair water transfer system
Maintenance, Construction & Renovation Projects

Saudi Water Authority
Rehabilitation of the area surrounding the chemical acid tanks (ferric chloride tank - sulfuric acid tank and sodium hypochlorite4 tank) in the Ras Al Khair production system

Fourth Land Forces Aviation Group
Rehabilitation of the sports stadium at the Military College in Al Uyaynah

Water Transmission & Technology
Furnishing some facility security headquarters at pumping stations and tanks affiliated with the Shuqaiq Water Transport System
Cathodic Protection Projects

Saudi Water Authority
Cathodic protection work for produced water tanks 1 and 2 in Khafji desalination plant with redesigning the cathodic protection for produced water tank 2 from 1 the grid anode type to the suspended anode type

Saudi Water Authority
Maintenance and repair of the cathodic protection system in the acid tank area at the third reverse 2 osmosis plant in the Jeddah production system

Saudi Water Authority
Maintenance of the cathodic protection system at the sea entrances of the third reverse osmosis plant in 3 the Jeddah production system