| 1 |
 |
ICAD Al-Shuaiba Cameras
Supply and installation of ICAD camera system enhancing security surveillance at Al-Shuaiba facilities.
|
| 2 |
 |
Al-Shaqiq–Abha–Dhahran Al-Janoub — CCTV
Comprehensive CCTV surveillance across pipelines, stations, pumping stations, and storage tanks.
|
| 3 |
 |
Al-Shaqiq–Abha–Sabt Al-Alaya — CCTV
Comprehensive CCTV surveillance across pipelines, stations, pumping stations, and storage tanks.
|
| 4 |
 |
Al-Wajh Desalination Plant — FM200
Supply, installation, testing and commissioning of FM200 clean-agent suppression for the 6.6 kV breaker room.
|
| 5 |
 |
Farasan Desalination Plant — FM200
Supply, installation, testing and commissioning of FM200 clean-agent suppression for the 6.6 kV breaker room.
|
| 6 |
 |
Dammam — Maternity & Children's Hospital Fire Sector
Complete fire sector construction for healthcare facility safety.
|
| 7 |
 |
Fourth Land Forces Aviation Group
Repair and maintenance of firefighting and alarm systems plus electric winch in the aircraft maintenance hangar.
|
| 8 |
 |
Rabigh Production Unit — 33 kV Protection
Autonomous fire suppression system for the 33 kV circuit breaker building.
|
| 9 |
 |
Tabuk Power Station — Halon Replacement
Complete Halon replacement for Turbine No. 3 with environmentally compliant technology.
|
| 10 |
 |
Tabuk Ground Forces Aviation — Fire Water Line
Replacement of fire water line with full testing and commissioning.
|
| 11 |
 |
Jeddah Production System — RO Fire Alarm
Maintenance, replacement and programming of fire alarm panels and smoke sensors.
|
| 12 |
 |
Jeddah Stations — Extinguisher Cylinders
Complete cylinder filling and comprehensive testing of the automatic fire extinguishing system.
|
| 13 |
 |
Jeddah Station — Fire Hose Supply
Supply of 80 suction and fire hoses in various sizes.
|
| 14 |
 |
Ras Al-Khair Production System — Leakage Seals
Technical support for replacing leakage seals of flash evaporation unit water boxes.
|
| 15 |
 |
Al-Qunfudhah Desalination Plant — Fire Alarm
Comprehensive repair, maintenance, and testing of fire alarm devices.
|
| 16 |
 |
Air Conditioning Pumps Supply
Supply and installation of air conditioning pumps and accessories.
|
| 17 |
 |
Medium Voltage Electrical Cable
Extension, connection, and testing of medium voltage cable for power distribution.
|
| 18 |
 |
SWC Jubail 2 Pump Station — IG 55 Cylinders
Refill, hydrostatic testing, and pressure testing of IG 55 inert gas cylinders.
|
| 19 |
 |
King Khalid Air Base — Fire Systems Rehabilitation
Comprehensive rehabilitation of fire protection and mechanical systems across multiple facilities.
|
| 20 |
 |
King Khalid University — Safety Systems
Implementation and equipment works including safety systems supply and installation in Abha.
|
| 21 |
 |
Jeddah Production System — 380 kV Building
Maintenance, supply, installation, and replacement of fire alarm and suppression systems.
|
| 22 |
 |
Jeddah Reverse Osmosis — FM200 Systems
FM200 suppression systems in electrical rooms at three locations within the third RO station.
|
| 23 |
 |
Jeddah Reverse Osmosis — Fire Alarm Maintenance
Comprehensive maintenance of fire alarm and suppression systems at multiple locations.
|
| 24 |
 |
Al-Shaqiq Production System — Warehouse Fire Pipes
Supply and installation of HDPE firefighting piping for warehouses.
|
| 25 |
 |
Ras Al-Khair Water Transfer — Fire Alarm Maintenance
Periodic maintenance and technical support for fire alarm systems.
|
| 26 |
 |
Al-Shuqiq Water Transfer — Fire Cylinders
Complete filling, supply, and maintenance of fire extinguisher cylinders.
|
| 27 |
 |
WTCO — Mechanical & Civil Works Agreement
Comprehensive agreement for integrated support of water transmission infrastructure.
|
| 28 |
 |
Tabuk Military City — Firefighting Materials
Supply of materials for the firefighting unit at King Abdulaziz Military City Administration.
|
| 29 |
 |
Tabuk Military City — Supplies Project
Comprehensive supply project providing essential materials and equipment.
|
| 30 |
 |
Tabuk Military City — Safety Department Materials
Securing and supplying safety department materials.
|
| 31 |
 |
Technical Extensions Installation
Installation and execution of technical extensions for facility infrastructure upgrades.
|
| 32 |
 |
Fire Suppression & Alarm Upgrades
Comprehensive upgrades to fire suppression and alarm systems across multiple facilities.
|
| 33 |
 |
Al-Lith Production Unit — Safety Upgrades
Complete upgrading of safety systems enhancing operational safety and compliance.
|
| 34 |
 |
Al-Khafji Production Unit — Drone Protection Netting
Supply and installation of drone protection netting for passive defense.
|
| 35 |
 |
Multiple Outlets — Fire Alarm Upgrades
Comprehensive fire alarm and suppression upgrades for multiple outlets and facilities.
|
| 36 |
 |
ZATCA — Fire Systems Framework
Framework agreement for rehabilitation and upgrading of fire suppression and alarm systems at all sites.
|
| 37 |
 |
Saudi Water Authority — Extinguisher Framework
Three-year framework for fire extinguisher supply and maintenance across all Kingdom sites.
|